News and insights
Updates and guidance from vCreative, built for radio, TV and digital operations teams.
Is your traffic system enough for production work?
You already own a traffic system and it does its job. So when somebody proposes workflow software, the fair question is whether it duplicates what you have.
It does not. Traffic and production cover different halves of the same operation, and the gap between them is where spots go missing. Here is where that line actually sits.
What your traffic system is built to do
Build and protect the log. Schedule inventory, manage avails, handle copy rotation and instructions, drive billing and reconciliation. That is a serious job and a good traffic system is not something you swap out casually.
But look at what it assumes: that a finished spot will exist by the time the log needs it. It manages the slot. It does not manage the making of the thing that fills the slot.
Everything between the order and the audio
Writing the request. Gathering the brief. Producing. Reviewing. Getting the client or the AE to sign off. Handling the revision they ask for on Thursday. Delivering in time for the log.
That sequence involves several people, several handoffs and a deadline nobody can move. In most stations it happens in email, a shared drive and a spreadsheet, running alongside the traffic system rather than inside it.
When a spot misses, it almost never failed in traffic. It failed somewhere in that gap.
What closing it actually looks like
Colin Cooper, Business Manager at Salem Media Group, describes the before as triplicate production forms. The after is a web page multiple people can see, and filling out a PO that takes less than a minute. They have been running it for over ten years and rolled it into their San Francisco stations, where he says the team is still singing its praises eight months in.
Rob King at Opus Broadcasting gives the detail that should interest anyone who owns the traffic side. Their production turnaround is now same day, revising and extending spots is a couple of clicks, and then this: "We don't really have to even do discrep reports any longer because everything is almost always in and done."
Read that again. Discrepancy reports are a traffic function. They shrank because the production side stopped failing. That is the clearest possible statement of where the gap was.
Why the gap is expensive before it is visible
It never shows up as a line item. It shows up as producers reworking incomplete requests, traffic chasing spots that are not cleared, approvals sitting unread, and somebody rebuilding the current status by walking down the hall to ask.
During a heavy week that overhead is what turns a near miss into a missed spot. Adding headcount does not fix it, because the problem is that the work has no shared system, not that people are slow.
vCreative has put numbers on the other side of that gap. Cyndi Bass, product manager for vProMedia, says a station that implements properly can expect turnaround times 20 to 30 percent faster, internal coordination effort down 25 to 40 percent, and production capacity up 10 to 20 percent on the same headcount, with full payback inside six months. Those are expectations rather than audited results, but they give you a scale to measure your own operation against.
What production workflow adds without touching what works
vPPO covers the production order from request to air: defined stages, named owners, a comment thread on the order itself, and a history you can audit when something needs explaining. vProMedia extends that same order flow to multi-platform and TV production, with more capability than vPPO. vPromotions handles contests and promotions. vEP coordinates campaigns across markets.
Your traffic system keeps doing exactly what it does. The difference is that the finished spot reliably exists when it asks for it, which was the assumption it was built on all along.
Find your own gap
If traffic is covered and spots still slip, the answer is on the production side, not in replacing something that works. Book a vCreative demo and we will map what happens at your station between the order landing and the audio being ready. Most teams are surprised by where the time actually goes.
Frequently asked questions
Does production workflow software replace a traffic system?
No. Traffic schedules inventory and drives billing. Production workflow covers the work that produces the spot before the log needs it: intake, production, review, approval, revisions and delivery. Different halves of the same operation.
We already have traffic software. Why would we need more?
Because a traffic system assumes the finished spot will exist in time. Producing it involves several people and handoffs, and in most stations that still runs on email and spreadsheets. That gap is where missed spots originate, which is why some stations see discrepancy reports drop after fixing it.
What does vPPO add to what we already own?
Complete intake, defined production stages with named owners, approvals with an audit trail, and shared visibility for traffic and production. It makes the finished spot reliably ready for the log instead of dependent on people remembering.